• Mail
        • Contact
        • Catalog

        body text

        Quick comparison

        General Comparison of COD with Conventional Ducting System
        Description of comparison C.O.D. Conventional Method
        Outer Duct Inner ducts Outer Duct Inner ducts
        Raw material H.D.P.E H.D.P.E P.V.C. H.D.P.E
        Length No limit No limit 6 meters(At maximum) No limit
        (Up to 500m or 1,000m)
        Connection No need
        (saves materials and accessories)
        In every 6 m
        Insertion of inner ducts No need To insert
        Intermediate Manhole No need to build To build in turning point
        Horizontal alignment
        of inner duct
        Straight Straight Straight Straight
        Saves optic cable about 3 to 5%  
        Trench Dimension
        (Volume)
        (28mm inner ducts in
        112mm outer duct)
        (Dimension)
        (No need man-working space:
        vertical cut)
        Up to 5 inner ducts
        0.3m(W) x 0.6m(H)
        (Slope cut to secure man-working space)
        3 inner ducts only
        0.5m(W) x 0.81m(H)
        Trench Bedding Rough bedding
        (passes over/by hurdles)
        Fine bedding