Features of COD
COD should be laid carefully so as to prevent soil, sand and water from entering COD through the end mouth. If coiled COD delivered to the site, it should be laid in accordance with the following procedure. The coiled COD should be uncoiled along the trenched ground, being held by laborers so that it is well laid inside of the trench. Make it sure to uncoiling is stretched straight.